Delay causes in road infrastructure projects in developing countries

Project delays adversely affect road infrastructure development in developing countries. Unfavorable consequences of project delays involve cost overrun, contractual disputes, arbitration, and quality non-conformities. Despite these risks, literature shows that delays are still a prevalent problem in construction management. Although there is a considerable number of publications on project delays, few studies have compared their causes between developing countries. Therefore, this study aimed to: a) classify and determine the level of influence of the delay causes; b) find the relationship between delay causes and country"s development; and c) propose recommendations for mitigating the most critical causes in developing countries. A systematic literature review provided a sample of 14 primary studies from Africa (50%) and Asia (50%). Based on this sample, the study found that developing countries, with a GDP per capita ($US2018) <= $ 2,000, may experience different delay causes depending on the economic and the geographical contexts. In African countries with a Global Competitiveness Index -GCI <= 56, road projects may experience delays due to financial issues of the project owner, and delays due to equipment/material issues of the project supplier/subcontractor. On the other hand, in Asian countries with a GCI between 62 and 49, road projects may experience delays due to financial issues of the project contractor, and delays due to planning issues of the project designer/consultant. According to these economic contexts, this study proposes a frame of causes and mitigation actions as a contribution to the risk analysis of road projects in developing countries.


Información adicional

País:     Chile

Autor(es):   

Año:     2020

ISSN:    0717-7925

Revista:    de la Construcción

Enlaces Relacionados